ELECTCO
PROJECT PORTFOLIO
Industrial · Upgrade

Diamond Meat Factory.

A 6-month fire safety system upgrade and new water tank installation for Diamond Meat Factory in Umm Ramool.

Location Umm Ramool, Dubai
Built-up Area 4,200 Sq. M
Duration 6 Months
Floors G + M

A specialized fire safety and water systems upgrade.

Delivered in partnership with ACE International Engineering Consultancy and MABCONS Contracting L.L.C, this 6-month upgrade modernized critical fire safety infrastructure.

Our scope covered complete fire-fighting systems, water tank installation, pumps, low voltage, and switchgear upgrades for this industrial facility.

All Projects
  • Address Plot 2150291, Umm Ramool, Dubai
  • Main Consultant ACE International Engineering Consultancy
  • Main Contractor MABCONS Contracting L.L.C
  • Project Duration 6 Months
  • Description Fire Safety System Upgrade & New Water Tank
  • Built-Up Area 4,200 Sq. M
  • Floors G + M
  • Scope of Work Engineering, Procurement, Installation & Commissioning of Complete Fire Fighting System, Water tank, Pumps, Low Voltage, Switchgears